FTTH Docs

Fiber network documentation inside Ravicor: the plant of each city drawn on the map (POPs, boxes, poles, condominiums, customers, cables and ducts), the boxes from the inside in the diagrams, serviceability by address and verification in the field.

With the management system integrated, the plant also shows the live network: who is in each box and who is offline.

Overview

FTTH Docs opens from the FTTH Docs item in the main menu and has its own navigation. The side menu stays collapsed, showing only the icons (hover to see the name and description of the screen); Collapse menu expands or collapses it, and the choice is remembered. At the top of the menu, the Open project block shows the project in use and leads to its map. The top bar shows FTTH Docs; the current screen is the highlighted item in the menu.

ScreenWhat it does
MapThe plant editor: boxes, poles, cables and customers on the map.
My ProjectsThe project list: the plant of each city or region.
Panel and ProblemsThe module at a glance (rollout, live network, occupancy, pending items) and everything that needs attention in the plant.
DiagramsThe boxes from the inside: splices, splitters and ports.
ReportsNumbers and lists of the plant, to review, print and export.
Serviceability and Received locationsThe verdict by address or coordinate, and the locations customers sent through the link.
FieldThe view for whoever is on the street: the boxes nearby and on-site verification.
TypesThe technical catalogs: box, cable, splitter, pole models and more.

Top bar and settings

  • Density: Compact, Comfortable or Spacious, for the spacing of the screens.
  • FTTH Docs settings: the gear at the right end of the bar, present on every screen of the module. It only appears for the Manage level. The settings are described in Types and settings.

Plan and box cap Plan limit

The module is part of the paid plans. Without one of them, the screens show Feature available on paid plans (most of them with the See plans button). The box cap is 500 on Basic and 1,500 on Normal; Premium, Gold and Enterprise have no limit. It counts only CTOs and CEOs, adding up all the projects of the installation. Upon reaching the cap, box creation warns that the current plan is fully drawn and offers See plans; on plans with a cap, the summary in the Layers panel shows the usage in the Plan cap line. What is already drawn is never erased by a plan change.

Permissions

On the Access groups screen, the FTTH Docs module has five levels, which apply to every screen of the module:

LevelWhat it allows
No accessDoes not see the module: it disappears from the menu for this group.
ViewDoes not create, change or delete anything. It can still search, measure with the Ruler, draw an Area and use Report for this area, Export KMZ, Export this area and Print; in the diagram, it uses the measurements, simulates a break, downloads the image and opens the worksheet.
Field editorEdits the plant on the map (boxes, poles, cables, pending items and photos), but does not create a new box, pole, customer or cable (no Network expansion palette) and does not open Bulk, Import, Export KMZ, Panel, Problems, Diagrams or Reports.
Add and editCreates and changes records, assembles the boxes in the diagram and changes statuses. It does not delete or configure the module: when trying to delete, "Your access level allows including and editing, but not deleting." appears.
ManageEverything. Only this level deletes projects, cables, parts and splices in bulk, resolves, reopens and deletes pending items on the map and opens the settings.

Edit mode

The Edit mode button, with the padlock, sits in the top bar of the Map and appears for the Add and edit and Manage levels. The map always opens with it off: the Network expansion palette, New task, Bulk, Import, Save as region and the buttons that change the selection disappear, nothing can be dragged, and a write action shows "Turn on Edit mode to change the plant." with the padlock pulsing. Turning it off in the middle of a drawing warns that it will be discarded, with the Turn off anyway button, and ends Edit route.

Phone and tablet

The side menu becomes a drawer, opened by the button in the top bar. The Layers and Tree panel opens collapsed: on a tablet it floats to the right of the map, on a phone it becomes a drawer at the bottom. On touch, the palette scrolls within itself, the targets are larger, the finger drags the route points and marks the print area, and the mouse hint cards do not appear. The Edit route panel becomes a drawer with a collapse button.

On the Map, on the phone, the top bar becomes compact: the search and Edit mode stay in view, and the rest (Bulk, undo, redo, Import, Export KMZ, Print and FTTH Docs settings) gathers under the More options button (the ⋮). A floating button named Tools opens the palette over the map. The drawer handle for Layers and Tree gained a shortcut for each tab, to open it directly without going through the arrow.


Projects

Each project is the plant of a city or region. The My Projects screen lists all of them, with Search project…, the Grid / List toggle and the New project button. Clicking a project opens its map.

The project card

It shows Boxes, POP, Cables and Length, the Rollout bar (the percentage of the plant in Deployed or Certified) and, in Grid, the date of the last change. The ⋮ menu (Add and edit and Manage levels) has Change, which opens the record, and Delete, only for Manage, which takes along everything drawn in the project, with no way back and with confirmation.

Create and change

The New project (or Edit project) window has the data on the left and the location map on the right.

  • Project name (up to 120 characters) and Description (optional).
  • Box service radius (meters): from 10 to 5,000. It is the reach drawn around each box on the map. It does not decide serviceability: that is decided by the search radius in the settings.
  • Homes passed (optional): how many properties the project network passes. With this number the Panel calculates the conversion rate.
  • Base project (optional): the drawing of the base project appears in this project as read-only (the backbone drawn once, visible in every city that points to it), in the from the base project layer of Layers > Display, with the icons of each type dimmed and the same balloon as Other projects, with the Open in its own project button. Inheritance has a single level (a project that already has a base cannot be a base, a project that is already a base cannot get a base) and the base must have the same origin: local with local, or from the same connected server.
  • Where it is: type a city, address or coordinate and click Search, or use Use my location. In Point, click or drag to mark the center of the project, where the map opens. In Territory, each click is a corner of the area; with three or more it closes and the map opens framed on it. Redraw erases the corners.

Projects from connected servers

With connected Ravicor servers whose connection allows FTTH Docs, the list gets sections by origin: Local and then one for each server, with the name, the Ravicor server tag and the address. The central creates, changes and deletes the projects of these servers right from there, with the same access levels. The Server field of the window decides where the new project will live; when editing, it only shows the origin. The card of a project from another server opens its record (for those who edit), not the map. The section may say "No projects on this server yet." or "Could not reach this server right now."


Map

The plant editor. On the left is the tool palette; on the right, the Layers and Tree panel; at the top, the project bar and the search.

Top bar

Project selector (switches the open project), Edit mode (the padlock from the Overview), Bulk, Import, Export KMZ and Print, described further below. On the map there are also the Dark map / Light map button (the choice is remembered) and the Map / Satellite selector. The map source (free or Google Maps) is set in Settings > Integrations. The map zooms in up to level 21; where the free satellite imagery does not reach the requested zoom, the last available image is enlarged instead of the gray screen.

Tool palette

The Show names / Hide names toggle keeps the name fixed next to each button; the groups start closed and remember whether they were left open. Select is the default tool: click to open the record, drag to move. The tools from POP to Duct are in the Network expansion group and only appear with Edit mode on; Ruler and Area are in the Tools group.

  • POP, FDB, Splice closure, HUB, Underground box, Slack loop (the coil: a point on the route with the slack meters, attached to a pole or box or projected onto the nearest cable; the cable slack total is the sum of the points plus the loose part): the OLT building, the service box, the splice box, the aggregation box that concentrates cables between the POP and the FDBs (hexagon on the map; counts toward the plan box limit like the FDB and the splice closure) and the underground pass-through box.
  • Pole and Line of poles: the support of the aerial network, to which boxes can be linked. With the line, trace the street and the system creates the spaced poles; when finished, choose What to create along the line (pole, FDB or underground box) and the Spacing between points (meters).
  • Condominium: a building with units served from the inside. Its record has Generate units in bulk (Block (optional), Floors, Units per floor).
  • Multiple boxes: configure once, place them with clicks and record everything with Save.
  • Customer: a subscriber marked directly on the map.
  • Backbone, Distribution, Drop, Duct: the trunk of the network, the cable that carries the signal to the service boxes, the final stretch to the customer's home and the underground path the cables run through.
  • New task: mark on the map what still needs to be done, with priority and assignee (see Panel and Problems).
  • Ruler and Area: the ruler measures distances without recording anything (click point by point, double click finishes, (Esc) cancels); the area draws a cutout to measure, export, select or save as a region (the region lives in the Regions layer and in the side tree; its card has Report for this region and Use as cutout). Right-clicking a point on the map offers Copy coordinates.

Layers and Tree

The right panel has two tabs. Each Layers group opens and closes with the arrow in its title and remembers its state.

  • Elements and Cables and ducts: turn each type on and off, with the count or the length. Each cable type has its own color; the duct is dashed. Drop starts off and is turned on automatically when you draw one.
  • Live network (only with the management system integrated): see below.
  • Display: Labels, Port capacity (the "free/total" badge on the pin; on by default, useful to turn off on plans with hundreds of boxes), Cluster when zoomed out (in large plants, with the choice by type), Tasks, Unmet demand, Regions, the from the base project layer and the Service radius.
  • Other projects: the other projects on the server, each with its distance to the open project and the neighbor tag on the ones right next to it. Check a project to see it over the map, dimmed and read-only, with the icons of each type and the cables in the type's color. Turn on neighbors checks all the neighbors at once and Turn all off unchecks them; with more than 8 projects, the Search project… field filters the list by name. The Open this project button next to each one opens its map. Clicking an item from another project opens a balloon with the name, the type, the status, the project it comes from and the Open in its own project button, which opens that project right on the item: that is where it is edited. The choice is saved per project.
  • Summary: boxes, length, Plan cap (on plans with a cap), count by status and the Loose ends, in red, when there are any.

The Tree lists the plant by folder: the folders created, Unorganized and Cables and ducts (with the length); clicking an item takes the map to it. Search in project… filters by name, code or tag, and the tags in use appear as clickable labels. The + creates a New folder; the pencil renames and the × deletes the folder. The diagram icon opens the box diagram, and the item's ⋮ menu opens Open box (or Properties, outside boxes) and Rename or move to folder, without opening the record first.

At the top, Search address or box finds any element of the project by name, and also of the other projects turned on (with the project name next to it), and completes the list with addresses (arrows to choose, Enter to go, Esc to close). It understands street and number and uses the project's city to find the right address; the plant comes first, and the address only appears in the list when it gives few results. For an element, the map goes to it and the marker blinks; for an address, a temporary pin appears.

Keyboard shortcuts

They do not work with the cursor in a text field or with a window open.

KeyAction
Double click or (Enter)Finishes the trace of the cable, ruler, area or line of poles.
(Backspace) or (Delete)Undoes the last point of the trace.
(Esc)Abandons the trace in progress; with no trace, goes back to Select. It also ends Edit route, the print marking and the Fibre route.
(Shift)Locks the angle and turns off Follow streets for that stretch.
(Alt)Ignores snapping to boxes and poles while tracing.
(Ctrl+K) or (Cmd+K)Opens the Tree with the cursor in the search.

Element record

With Select, a click opens the record (on a box with subscribers from the management system, it first opens the live network of the box, see below); a double click on a box opens the diagram. Right-clicking opens the menu with Properties, Open diagram, Single-line, Cable diagram, Light up to the POP (and Turn off lighting while it is lit), Power budget, History, Copy coordinates, Client sketch (on the customer) and Delete.

  • Fields: Name, Code, Box type (on FDB, splice closure and HUB: switches one for another without losing diagram, cables and photos), Catalog model (or No model), Status and Status since (when the status changes, it comes with the current time and can be adjusted), Folder, Linked pole (the nearest ones), Color on the map (Use the default color goes back to the rule: without its own color, the model color applies and, without it, the status color), Tags (separated by commas) and Note, plus the coordinate of the point.
  • Pole: gets Utility code, Approval, Side, Sharing contract (the contracts are kept in Types), Attachment points (how many points your company occupies on the pole) and Identified on (date the tag was placed).
  • Customer: gets ONU serial and PPPoE login. With either of them, the record shows the status and the Read power from the network; a reading older than one week appears as Last reading.
  • Buttons: Open diagram, Photos (on boxes, POP, condominium and pole; JPG, PNG or WEBP, up to 5 MB each), Label (QR to print and stick on the box), Single-line, New task and, on the customer, Sketch.

Statuses and colors: Planned (orange), Not deployed (red), Deployed (green) and Certified (blue). Cables are colored by their role in the network, not by status. What is not in the field yet also stands out by its shape: a Planned or Not deployed cable is drawn dotted (ducts stay dashed) and a box (FDB, splice closure, HUB, POP, condominium and underground box) gets a dashed ring around it, even when it has its own color. This also applies to other projects, the printout and the client sketch.

Drawing cables

Choose Backbone, Distribution, Drop or Duct in the palette and click point by point; clicking on a box or pole attaches the cable to it. With Follow streets on, the stretch between one click and the next follows the streets; turn it off to trace in a straight line. Finish with a double click or (Enter); (Esc) cancels. The insertion bar also has Save and Cancel.

  • Model of this cable: after the cable is created, the system asks for the catalog model, with those of the same type first. Choose later leaves the cable without a model. Check Use this model for the next ... cables in this session, without asking so you are not asked again; the insertion bar then shows Model ... · change (or No model · change). Duct has no model.
  • Attach to poles?: when the trace passes near poles, the system offers to Attach the cable to them, pole by pole; Not now continues without attaching and Do not ask again in this session silences the question.
  • What to create at the loose end: if an end does not touch any equipment, the system stops and asks. Choose FDB or splice closure and click Create at the end; or Create and open a task, to leave a pending item at the exact point; or Go back and adjust. On a Drop with one end on a box and the other loose, the question also offers Customer: the customer is created there and the drop is already connected to the first free port of the service splitter; with no free port, the drop is left unconnected and the warning asks you to connect it through the diagram.
  • Automatic name: a cable with both ends attached is created with the route name (C-origin-destination); without both ends, it gets the numbering by type (BB, DIST, DROP or DUTO and the number). When one of the boxes at the ends is renamed, the automatic name follows. A typed name is never rewritten.

Cable record

Click the cable to open the record: Name, Type, Status, Status since, Catalog model, Slack (meters) (the loose part of the slack; the total adds to it the Slack loop points of the route, listed on the card with Go to, and is included in the Total length), Note and Tags, plus the Path (without the slack), the points, the Fibers in use (with a model) and the Ends. The length comes from the path and is not typed. Buttons: Simulate a break (what runs through the cable and goes down with it, and how many boxes are left without a path to the POP, with how many subscribers and how many online right now; the physical part requires a POP drawn; see "If it breaks, who goes down?" below), Refit along streets (shows the new path highlighted over the current dashed one; nothing changes until Apply), Connect to poles and Connect to boxes (attach the cable to the poles, or make the cable enter the boxes, up to the distance given; with boxes, the cable is split into stretches named after their own ends; a cable that already has splices asks for a confirmation and splits keeping the splices at each end on the right stretch and the fiber numbering) and Edit route.

Edit route

From the cable record or by right-clicking the cable. The panel shows the cable name (editable), the Path length and the list of points; in the footer, Cancel (or (Esc)) discards and Finish saves and reports the new length.

  • On the map: drag the dots and drop them on a pole or box to attach the cable to it (blue is a middle point, amber is an end, green is attached). The + between two points inserts one in between; right-clicking a dot offers Remove this point.
  • In the list: drag to reorder, remove a point or see the point on the map. In Add points, choose at the start or at the end and click on the map.
  • Boxes: a new end on a box makes the cable reach it and appear in the diagram; a middle point dropped on a box splits the cable into stretches; an already spliced cable asks for a confirmation and splits keeping the splices at each end on the right stretch and the fiber numbering, and at the new box the fibers stay free for fusion, tap-off or pass-through (the signal stops there until you splice). A cable with splices in a box the new route would leave still asks you to remove the splices first.
  • Name that follows the route: if the name is still the automatic one and the ends changed, it is regenerated and the screen warns. If someone else changed the cable while you were editing, nothing is saved: reload the map and redo it.

The Fibre route, opened from the diagram, shows on the map the path of a fiber, box by box.

Area and selection

With the Area tool, draw the cutout. The bar shows the measurement and the actions Report for this area, Export this area, Select what is inside and Save as region (the region appears in the Regions layer and in the map's side tree; its card has Report for this region, opening the Network Analysis for that slice only, and Use as cutout); the × clears the area. With the selection made, the bar shows how many are selected and offers Move as a block (click on the map where the center of the selection should be and confirm; cables with both ends in the selection move whole, the others follow by the end), Recolor and Status (open Bulk already applied to the area) and Move to another project (choose the Destination project; cables that cross the boundary release the end).

Bulk

The Bulk button opens Bulk actions, with three tabs. In all of them, Apply to chooses between The whole project and Inside the marked area, the system says how many items will change and Undo reverts it later.

  • Recolor: choose What to recolor (one type or All types) and the color, which overrides the model color and the status color; Use the model or status color goes back to the default color.
  • Status: check Which elements are included (each type and the cables), the New status and the Survey date and time, recorded as "Status since" (blank uses the current time); the utility company poles already count as deployed, uncheck the type to leave them out. Click Apply status.
  • Path along the streets: redoes the path of the cables along the streets, one by one. Check Which cables are included (drop comes unchecked) and, if you want, Straight paths only (two points), which preserves the cables drawn by hand or attached to poles. The screen estimates the time, shows the progress and has Stop; whatever was already refit stays saved.

Merge cables

When the middle box of a route is removed, the two sections do not need to be redrawn. When deleting a box with exactly two cables of the same type attached, the confirmation shows Merge the two cables into one after deleting, already checked. Right-clicking a cable whose loose end touches the loose end of another cable of the same type offers Merge with the other cable's name. The route is joined, the automatic name is rebuilt from the new ends, the length becomes the sum, and the splices and diagram position at the far end of the second cable move to the remaining cable (fiber N stays fiber N). Both must have the same type and model. Merging is not covered by Undo.

Undo and redo

Every action on the map can be reverted. After moving a box (or several in a block), editing a cable route, changing a form, renaming, moving to a folder, creating, painting, changing status in bulk or deleting, a notice appears at the bottom of the map with the action name and the Undo button. The undo and redo buttons sit on the top bar next to Bulk and say in their title what will be undone or redone; Ctrl+Z undoes and Ctrl+Y (or Ctrl+Shift+Z) redoes. The history button opens Actions in this session: the list of what was done, with the time; clicking an action undoes everything up to it.

  • Deleted items come back whole: the box returns with the same name, the diagram, the splices, the port names and powers, the notes, the photos, the building units and the cable ends reattached; the cable returns with its splices in both boxes. Deleted items are kept for 30 days.
  • The action list belongs to your tab and the open project: it survives a page reload and ends when the tab closes. It only works with Edit mode on and outside route editing.
  • Not reverted by Undo: a cable split when passing through a box, the bulk street rerouting (which has its own Undo in its window), tasks, regions and folders.

Live network and ERP subscribers

The house pin of a subscriber imported from the management system has Link to a box in its popup: it opens the list of the nearest boxes (the one reported by the ERP comes preselected) and creates the customer on the plan where the ERP says they live, with their login, attached to the box, with the drop and the first free port of the customer splitter, just like linking from Serviceability. Those already on the plan show See the customer on the plan. The action is covered by Undo.

With the management system integrated, the Live network group in Layers shows the network in operation over the plant, with the summary of subscribers online, offline and with no reading.

  • Health on the boxes: each box shows the subscribers online and offline, and the summary flags the boxes with a customer offline and with more customers than ports. Clicking a box with subscribers opens the (box name) · Live network card: percentage online, online, offline, in the ERP, Free ports, Free pass-through ports, Optical signal, Who is in this box (offline first), See properties and Open diagram.
  • Subscribers from the ERP and ERP POPs (the layer only appears with at least one subscriber with coordinates): the customers and POPs of the management system on the map. In Colour, choose by status (green online, red offline, gray no reading), a palette color or Other colour. Cluster when zoomed out groups nearby points when the map is zoomed out.

Print, export and import

  • Print: drag on the map to mark the area that goes to paper (a drawing in progress is discarded, with a warning). In the Print project window, choose the Sheet size (A0, A1, A3 or A4, with the measurements and the Approximate scale; the orientation follows the shape of the area) and click Print. Cancel goes back to the marking; (Esc) leaves it. It also works at the View level.
  • Export KMZ (or Export this area): choose KMZ (Google Earth and design tools) or GeoJSON (QGIS and web tools) and the layers, and click Download.
  • Import KMZ, KML, GeoJSON or CSV: files up to 40 MB. The preview lists each folder of the file and what it Becomes (or Do not import), with the option Skip what already exists in the project with the same name, and reports how many boxes the plan still fits.
  • Colors from Google My Maps and Google Earth: when the KML or KMZ carries colored markers, the preview shows the Colors found in the file, with each count and, per color, the choice Paint the boxes with this color, Paint and set status or Ignore this color. Alongside comes the Update existing boxes mode: nothing is created, each marker finds the already registered box by name (or, without an equal name, by position up to 1 m away) and receives only the chosen color and status; anything without a match comes out in a list in the result, for review. In the Add to the plant mode, new boxes are born already painted according to the mapping. The applied color is the Color on the map of the box form, the same as always.
  • Copy from another project on this server (in the same Import window, below the file area): choose the Source project and click See what comes in. The whole plan comes along: folders, boxes, poles, cables attached to the boxes, each box diagram with splitters and splices, ports, notes, photos, pending items and regions (a file only carries points and routes). The preview reports the boxes needed and, when the destination already has items with the same name at the same position, offers Stays as it is (the one here is reused, its diagram untouched) or Is replaced (the one here goes to the project trash; the option appears for those who can delete). Use it to merge regions into a general project and to keep the general project equal to the region after editing it. The copy also saves a region named after the source project, wrapping what came in: it is what keeps the district's report coming out, live, inside the general project.
  • GeogridMaps export (.zip, up to 80 MB per file and 200 MB in total): the summary shows the counts, the models that Will be created in the catalog and What does not come in. It also brings the splices and lists those that did not come in, plus the comments written on fibers and ports in Geogrid, which enter as diagram annotations on the same fiber and the same port (a comment on an OLT uplink becomes an annotation on the device itself). If the plant was already imported, re-importing the same export with the skip existing option only adds the missing annotations, without touching what the operator already wrote. Everything goes into one folder and with one tag; if the plan does not fit it, nothing is saved halfway; in a project with a drawing, it adds to what exists.
  • GeoSite Telecom export (KML per layer or .zip): GeoSite does not export fusions or splices; what was left out appears in File notes. There is the option Skip what already exists in the project (same name or same position), and the spans with no fiber count have the count read from the line color, which GeoSite fixes by fiber count (1, 6, 12, 24 and 72 fibers); spans of another color get the chosen model (the GeoSite default or one from the catalog).
  • OZmap spreadsheet (.xlsx): in Import, send the export spreadsheet from OZmap. The preview shows what will be created and the File notes before anything is saved. What comes in: the boxes (CE becomes a Splice closure; FDB, POP and pull box), the poles, the cables with their ends connected to the boxes, the drops up to the customer, the splitters, ODFs and OLTs inside the boxes, the customers with their ERP code and connected to the splitter port the spreadsheet states, and the pole slack loops, as slack points. If the OZmap KML was already imported, the spreadsheet can be imported on top of it in the same project: what already exists is reused (by name, by position or by the customer code in the ERP), the loose cables get their ends in the boxes and only what is missing is created. Re-importing creates nothing twice. Everything comes in with the tag ozmap, and what is created goes into the OZmap folder. Left to be done by hand: the fiber to fiber splices, which the OZmap export does not bring (splicing is done in the diagram); a pole slack loop with no cable set, when the spreadsheet does not say which cable it belongs to (choose the cable in the slack record); the switch, which becomes a note in the box diagram; pending items and premises without a customer, which do not become points on the map.

Box diagram

The diagram shows the inside of a box (FDB, splice closure, POP, condominium or underground box): the cables that arrive, the parts assembled inside and each splice between them. There you assemble the box, splice fiber by fiber, check the expected power at each port and generate the documentation for the field.

How to open

From the map: double click the box, Open diagram in the right-click menu or in the properties, or the diagram icon in the Tree. The diagram opens in a floating window over the map; Open in full page leads to a page of its own, with the Single-line and Back to the map buttons. The Label with a QR code, stuck on the box, takes the phone camera straight to the diagram, after login; if the box was deleted or the labels were reissued, "This label is no longer valid" appears. With a cable selected, Open the box on the other end leads to the box where the cable ends.

The access levels are those in the Overview. In the diagram, View sees the drawing, the power values and the hints, uses the measurements, simulates a break, downloads the image and opens the worksheet; the status selector is locked and, of the shortcuts, only Esc works. Add and edit places parts, splices, disconnects one by one, renames, annotates, moves, undoes steps, uses Assemble POP, Connect cables and Align and changes the status. Manage also has Clear connections, deleting a cable and a part (including with the Delete key) and the lasso's Remove the splices.

The palette sits to the left of the drawing (on a phone, behind the Tools button), with Show names / Hide names, Select, the parts, Assemble POP, Connect cables (T), Align (A), Clear connections, the measurements, the outputs and the Shortcuts card.

Cables

Each cable that passes through the box is a card with the name, the fiber count, the model and a numbered dot in the color of each fiber, following the model's color code. On a cable with more than one loose tube, a vertical stripe on the card edge marks each tube, with the standard color and the number. A cable with no model warns "Pick this cable model to see its fibers." and has no fibers to splice. On the drop of a customer with a monitored ONU, the card shows the real reading in dBm, colored by the difference from the expected value. The card drags like a part. Click it to see the buttons:

  • Rotate the cable (90° per click), Flip the ports side (E), Cable comment (the text shows on the card, below the name and model, and goes to the annotations table of the printout), Back to the column (when the card was moved) and Open the box on the other end (when the cable ends in another box).
  • If it breaks, who goes down?: simulates the break in two parts. What runs through this cable and goes down with it follows each fiber of the cable on both sides, through splices, splitters, ODFs and equipment, and lists the Transports and links between equipment (SFP to SFP, with the fibers used), the PON circuits (the OLT port, the boxes and the customers served), the Spliced fibers with no active equipment at the end and how many fibers have no splice; this is the answer when the POPs are interconnected and no box loses its path. When the cut takes down the last optical path linking a POP's equipment to the other POPs', a highlighted warning says the POP becomes isolated from the other POPs; in a closed ring, breaking one side only isolates nothing and the warning does not appear. Physical path to the POP shows how many boxes are left without a route, how many ERP subscribers they have and how many are online right now, with the list of affected ones; customers drawn on the plant (hanging by drop) count in the On the plant column, with online from the live ONU or session reading, and cutting a drop says its customer loses the path. The cable needs a catalog model (the fiber count comes from it) and both ends attached; the physical part requires a POP drawn. The same button exists in the cable record on the map.
  • Delete the cable (it leaves the map too): removes the cable from the map and from the box, with the splices of its fibers, after confirmation and with no way back. The Delete key does the same (Manage level).

Parts

When you choose Splitter, ODF, OLT or Optical equipment, the New equipment card opens with Equipment type, Type (the registered model) and Name, already suggested in sequence; on the ODF, the Ports field (default 12, up to 144). The new part is created below the last one; with no registered model, the warning asks you to register one in Types.

  • Splitter (S): a cone, green on the service splitter and blue on the tap splitter (or the model's own color). A connectorized splitter gets " /AC" in its title and its splices count as connectors. On the unbalanced one with a ratio set (e.g. 20/80), the outputs show the real percentage instead of 1 and 2, with the highest on the pass-through; the percentage also appears in route texts and on the OTDR trace.
  • ODF (D): the front is on the right and receives the patch cords; the rear is on the left and receives the cable. On creation (and on the part card, for an already drawn ODF), Trays and Fibers per tray group the ports: each tray becomes a rectangle with the B1, B2... tag on the drawing. When the front and rear of the same position are both spliced, an internal red line links one to the other.
  • OLT (O): From monitoring (monitored OLTs, with slots and ports coming from the authorized ONUs) or From the catalog. The ports appear as PON slot/port (PON 1/0, for example); on the monitored OLT, each port shows how many ONUs and how many online. The output power appears in the footer or in the title of the part.
  • Optical equipment (G): switch with SFP, OLT uplink or any equipment with SFP and PON ports, with a model from Types. With both types, the SFP ports are on the left.
  • Note (N): a free-standing remark on the drawing, up to 500 characters. Enter breaks the line to build lists, and the card grows with the text (up to 16 lines; the full text is in the hint).
  • Assemble POP: choose the monitored OLT and, if you want, the Trunk cable on the ODF rear (optional). The OLT is created with the slots and ports from monitoring, the ODF of its size and the patch cords connected port to port. The final message says how many patch cords (and splices on the trunk) were created; a separate warning counts the ports skipped because they were already taken. A large OLT can be assembled in several parts, each with its own ODF.

Working with parts: click a part to select it. Below it appear Rotate the selected part (R), Mirror the piece (swaps the port sides) (E) and Rename (pencil), which opens Name in the drawing and Piece annotation; on the OLT and the optical equipment it also brings Transmit power and, on the optical equipment, Patch cords to the ODF. Double clicking the splitter or the ODF and right-clicking the part open the same card; on the note, the text editing. Drag to move (Ctrl+click adds parts to the selection). To delete, select and press Delete: the confirmation warns that the splices connected to the part and the sensor link go along.

Ports, annotations and power: right-clicking a port (on touch, a long press) opens what makes sense for it. On an OLT, ODF or optical equipment port, Port name (appears next to the port and goes on the worksheet); on the OLT and the equipment, also Transmit power and Port sensor. On a splitter output, Reserve port, Block port or Release, with Reason (optional), and Annotation: a blocked port does not count as free until it is released, a reservation lasts 7 days and expires on its own, and a spliced port must have the splice removed first. On a cable fiber and on a splitter input, Annotation directly; on the part, Rename.

  • Annotation: text attached to a port, fiber or part; it appears in the hint, marks the port with a ring and goes on the worksheet. Blank removes it.
  • PON port transmit power (OLT): per port, choose the Module class (B+, C+, C++, C+++, PX20+, PX20++, PX20+++), which fills in the typical value, or type it in Power (dBm). Catalog default goes back to the model value; Apply to every port copies the choice to all of them. It applies only to this OLT in this project. Double clicking the OLT opens the same card for those who edit.
  • Port transmit power (optical equipment): the port with a value becomes a light source in the calculation; blank uses the catalog.
  • Port sensor: link a monitoring sensor to the port (Search sensor by part of the sensor or device name); the real reading appears next to the expected power. Unlink undoes it.
  • Patch cords to the ODF (optical equipment): the equipment ports become patch cords on the front ports of the ODF, in order, Starting at front port chosen. A port already taken is skipped.
  • Slots shown on this piece (OLT with more than one slot): choose from slot and to slot. An OLT larger than 32 ports can have another part in the same box with the remaining slots; on a single-slot OLT with more than 32 ports there is the option to show all the ports in the same part.

Connections

  • Click-by-click splice: click a port and then another ("Pick the other end. Esc cancels."). The splice is created as a fusion; on a connectorized splitter and on the ODF front (where the patch cord couples), as a connector. The ODF rear, where the cable is fused, stays fusion. Between two ports (OLT, optical device or the ODF front) the connector is a patch cord and the loss counts at both ends: from the OLT port to the street fiber, through the ODF, that is two connectors and one splice. In the drawing, a pass-through is a solid stroke and a splice is dashed; unlit, the pass-through turns dotted and the splice dash-dot.
  • Disconnect: clicking a port that is already spliced asks "Undo the splice on this port?". Clicking the wire opens the splice menu with Description, Splice type, Automatic route (when the path was adjusted by hand) and Disconnect.
  • Splice type: switches between Fusion and Connector and picks the catalog Model (or Default); the chosen model's loss is what enters the power calculation. It also fixes old links made when everything started as fusion. Direct passage does not change type: it is undone and redone as a splice.
  • Description: text written over the line, such as "GOES TO...", for Only this splice or for The whole route: follows the same fiber through the boxes; blank erases it. The text comes out in the color of the spliced fiber, with an outline that keeps it readable in light and dark themes and on the PNG. In the same card, Tray says which tray the splice is placed in: it appears on the wire as a badge (B3, for example) and organizes the worksheet matrix; 0 removes the mark.
  • Wire path: drag a stretch of the wire to adjust its path in the drawing.
  • Connect cables (T): choose From cable, To cable and What to create: Pass-through (the fiber crosses, no loss) or Splice (each fiber pair pays the splice loss), with Splice model (or No model (standard loss)), and confirm with Create pass-throughs or Create splices. Fiber 1 goes to fiber 1, 2 to 2, and so on; whatever is already spliced stays as it is. It requires two cables with a model in the box.
  • Selection lasso: drag over an empty area of the drawing to select the splices whose wire passes through it (Ctrl adds to the previous selection). The bar shows how many were selected, with the Remove the splices button; the Delete key does the same. It asks for confirmation, has no way back and requires the Manage level. Esc cancels the lasso.

In the drawing, the solid line in the fiber color is a pass-through; a connector is the solid line with a small white square at both ends; the dashed one is a fusion; the short, faded dotted line is a path with no light today; the arrows on the wire show the direction of the signal.

Undo and redo: Ctrl+Z undoes and Ctrl+Y (or Ctrl+Shift+Z) redoes the steps of this session: splicing, disconnecting, wire path and Automatic route, moving, rotating and mirroring parts (including in a group and Align), renaming, blocking or reserving a port, port name, annotation, creating a part and changing a cable. Bulk actions are not included and clear the previous steps: Assemble POP, Connect cables (T), Clear connections, the lasso's Remove the splices, deleting a cable or part, port power values, port sensor and patch cords to the ODF. If someone else changed the same point afterwards, the step is not applied and the screen warns; if someone is working on the box at that moment: "Someone else is working on this box right now. Try again in a moment."

Reading the box

  • Ports: the expected power appears next to each port, colored as ok, attention or critical; with a linked sensor, the real reading comes right after, with the ◉ symbol. Green is free, red is blocked, amber is reserved; the live PON of the OLT has a green outline and an annotated port gets a ring.
  • Port card (on mouse hover): name, state with the reason, annotation and power. In Signal origin appear the OLT and the PON, the boxes along the path with dBm and class, and the total in meters and in dB of loss. An OLT or equipment port with power is a Light source; a port with no light shows "No light expected at this port".
  • Footer: Cables and Fibers, Splice, Connector and Pass-throughs, Splitter, Free ports (over the total of service outputs, with the taken ones indicated), Free pass-through ports, Worst port (dBm) (the lowest expected power; with no OLT in the project, the footer asks you to draw one) and the Status selector. With open pending items in the box, a badge above the summary shows how many there are and their titles.

Measurements

In all three modes, clicking a port measures and does not splice; they also work for those who only view, and Esc leaves the mode.

  • Visual fault locator (VFL): lights up from the clicked port. The path turns red and the rest fades. The message says how many points the light reaches, or warns that it stops at the end of the cable or that the port is not spliced.
  • OTDR trace: measures the path from the port. The card shows Distance, Total loss, dBm and Events (table Distance, Point, Event, Loss and dBm), with Download the route (CSV) and Download the route (KML).
  • Fibre route: shows on the map the path of the fiber that passes through the port. In the floating window, it closes and the map highlights the route; in the full page, the map opens in another tab. A loose port warns "This port is not connected to any fibre."

Phone and tablet

The Zoom in, Zoom out and Fit to screen buttons appear only on touch, and on a narrow screen the drawing opens framed to the width. Parts and cable cards are dragged with the finger; tapping a port still makes a splice. The buttons of the selected part and cable are larger, and the Rename pencil plays the role of the right click. The mouse port card does not exist on touch.

Outputs and history

  • Download image: high resolution PNG of the drawing, with a white background and the box name as the file name.
  • Box worksheet: opens in a new tab a sheet to print or save as PDF (landscape works best): the title block with the box, the type, the project, the status, the totals, the issue date and by whom; the drawing as it was on the screen; the Splice matrix grouped by tray (Tray, From, Splice, To, Description and dBm) and the Annotations table. Download the matrix (CSV) takes the matrix to a spreadsheet.
  • History: the decisions in the diagram go into the box history, opened by right-clicking the box on the map: placing and removing parts, splicing and removing splices, connecting cables, assembling the POP, deleting a cable, port name, annotation, sensor, port power and status change. Tidying up the drawing (moving, rotating, aligning) is not included.

Shortcuts

The Shortcuts card on the screen lists the same items. In View, only Esc works.

Key or gestureAction
S, D, O, G, NSplitter, ODF, OLT, Optical equipment, Note
TConnect cables
AAlign
RRotate the selected part
EMirror the selected part (on the cable: flip the ports side)
DelDelete the selected part (also the selected cable or the lassoed splices)
Ctrl+Z / Ctrl+YUndo the last action / Redo
Right clickOn an OLT, ODF or optical equipment port, port name; on a splitter output, block or reserve; on the part, rename
AnnotationRight click on the cable fiber or on the splitter input and output; for the whole cable, the Cable comment button
EscCancels the splice in progress, the lasso, the selection and the measurement modes

Panel and Problems

The Panel adds up all the company's projects at once, with no project filter (the breakdown by project appears in the tables). Blocks with no data do not appear: optical health only shows up with OLT readings, occupancy only with documented ports and growth only with serviceability queries.

Top numbers

  • Cards: Boxes (FDB/splice closure), POP, Poles, Cables, Length (with how many meters are already deployed) and Projects.
  • Deployment rate: the donut with the "online" percentage, the text "X of Y boxes deployed or certified." and a bar with the breakdown of boxes by status. Only Deployed and Certified count as network online.
  • Plan limit On plans with a cap, the bar "X of Y boxes in your plan.", with the See plans link.

Live network and optical health

Live network is the match between the plant and the subscribers of the management system: Customers in boxes, Live now, Offline and No reading (subscribers on concentrators that the installation does not collect: they are not offline). If no subscriber appears, the screen tells you to check whether the box name in the ERP is the same as in the drawing. With OLT readings, Optical health of the boxes splits the boxes into Stable, Losing signal and Critical, comparing the last week with the first of the last 30 days; the list of the worst shows the dB lost, the current dBm and the number of ONUs, with a link to the box on the map.

Network occupancy

The cards Installed ports, Taken, Free, Occupancy and, when the project gives the homes passed, Take rate; with more subscribers than drawn ports, a warning shows how many are left over. With more than one neighborhood, the Occupancy by neighborhood table (the neighborhood comes from the subscriber record); with more than one project, the By project table (Project, with a link to the report, Installed ports, Taken, Occupancy and Full boxes).

Demand and growth

  • Where the network needs to grow: Queries, Not serviceable and Turned down (%) of the serviceability queries in the last 180 days, with the points that accumulate the most unserved queries (the same as in the map's Unmet demand layer).
  • Where to expand first: the clusters of denied queries in the last 90 days, with Denied checks, Nearest box with a port ("none within 2 km" when there is none) and New plant (estimated).
  • Plant growth: columns per month with Boxes drawn and Customers drawn, by the date each item was drawn.

Problems

The Problems item in the menu opens the Panel already positioned on the blocks that call for action. Network problems lists the boxes with a customer offline right now, across all projects, from the most affected to the least ("X of Y client(s) offline right now"), with the name leading to the point on the map; with nothing offline, "All up: no client offline right now." Needs someone lists the plant alerts with the count, the explanation and examples with a link to the map, the serious ones highlighted; with nothing, "Nothing pending in the plant."

AlertWhat it indicates
Box with no cable (serious)No cable reaches the box: it still needs to be traced, or the end was left loose when the drawing was moved.
Customer with no dropThe customer point exists on the map, but no drop reaches it.
Box with no poleOnly in projects that document poles.
Cable with no modelThe cable is left out of the report by fiber count.
Pole with no identification (serious)The company occupies an attachment point on the pole with no contract or identification date on record.
Pole without useA pole with no cable passing and no box hanging.
Cable arrives and is not splicedThe cable touches the box, but none of its fibers was spliced in the diagram.
Probable cable break (serious)Two or more boxes in the same project with all customers offline, explained by a single cable span.
Signal heading to the threshold (serious)A box whose signal is expected to cross -27 dBm within the period shown ("~N d").
Box losing signal (serious)The optical signal of the box subscribers dropped in the last 30 days.
Outage with a common origin (serious)Several subscribers offline at the same time, all below the same element.
Box about to fill upAt the sales pace of the last months, the box runs out of ports within three months.
Open tasksPending items from the map or the Field still open, with the assignee.
More customers than ports (serious)A box with more subscribers than drawn ports.

Activity, projects and pending items

Recent activity shows the latest changes in the module (up to 40), with who made them and when; past 8, the Show more button opens the rest and Show less collapses it again. The My Projects table brings Project (with a link to the map), Boxes (FDB/splice closure), POP, Cables, Length, Deployment rate and Online (30 days), a trend line with the percentage. Pending items are created on the map or in the Field, with What needs to be done, Priority (Low, Normal, High), Assignee (or "Nobody in particular") and Description; in the record, for the Manage level, Mark as resolved, Reopen, Turn into element (resolves the pending item and creates the element in its place) and delete.


Serviceability

It answers whether the network serves an address. Type in Address, city or coordinate (-19.91, -43.88) and click Check (or Enter). The query looks at the company's whole network, without choosing a project. If the address is not found, the screen says "Address not found. Try adding city and state, or mark it on the map."

Verdict

VerdictWhen it appears
ServiceableThere is a deployed or certified box with a free port within the radius.
Network not built yetThe boxes near the point are still only planned: none has been deployed.
Network is there, ports are notThere is a box nearby, but with no documented diagram or with all ports taken.
Not serviceableNo box within the radius. If there are subscribers nearby, the screen suggests checking the plant.

If the listed boxes are full and another one within the radius has a free port, the nearest of them joins the list. The result brings the coordinates of the point (with Copy coordinates and Open in Google Maps; when the point came from a customer, from whom, when and the accuracy), the Nearby boxes (Name with the project, Distance, Free ports over the total, free pass-through ports, badges for blocked and reserved ports, "no diagram", free units in a condominium, and Status), the Neighborhood (the customers drawn nearby and how many subscribers of the management system there are in the area) and the map with the radius circle, the Queried point and the boxes in green (with a free port), orange (no diagram) or red (no port), with Map / Satellite and Dark map / Light map.

Link customer (box with a free port or still without a diagram) asks for the Customer name and creates the customer at the queried point, with the drop to the box, on the first free port of the splitter; if the box has no splitter port or no documented path to the OLT, the connection is left for the diagram. Reserve port (box with a free port) reserves the first free port for 7 days. The queries of those with write permission are recorded and feed the map's Unmet demand layer and the growth blocks of the Panel. The search radius, the maximum of boxes listed and the link validity are in the FTTH Docs settings; the project's service radius can widen the search radius, never reduce it, and saving the settings reruns the last query.

Ask the customer for their location

The Ask the customer for their location button (in Serviceability and in Received locations, for those who can write) generates a link for the customer to mark where they are. Fill in Who is it for (optional) (name or phone) and click Generate link; then Copy or WhatsApp (with the message ready). The link is valid for the hours set in the settings, accepts a single answer and requires a secure address (HTTPS). In Recent requests, each request shows whether the customer has already answered (with Check serviceability), whether it is waiting or whether it expired. The customer opens a page with no login, with the company name and the Share my location button; it does not show the network or say whether it is serviceable.

Received locations

Filters All, Received, Waiting and Expired, with the count, and search by name or phone. The list brings For whom, Status and Coordinates: the received ones, with time and accuracy, copy, Google Maps, Show on map and Check serviceability; the waiting ones, with the validity, Copy link and WhatsApp. The map shows the received points, with Check serviceability in the balloon. Delete is only for the Manage level and takes along the location sent by the customer.

On the ISP website

The same query exists in the public API.


Field and sketch

The Field is the screen for the technician on the street, made for the phone. Tap Use my location (only on a secure address, with the padlock in the browser bar, and with location permission granted) and the screen lists What is near me: POPs, CTOs, CEOs, condominiums, underground boxes and poles within a 1 km radius, from nearest to farthest, with name, distance, type, status, project and the badges for free ports, free pass-through ports, pending items and photos. Without GPS, enter an address, a coordinate or the name of a box and use Use this point; with no point at all, the list starts from the center of the default project, within a 5 km radius.

The box record shows Live now (customers online over those measured, plus those with no reading), Free ports, Free pass-through ports and the signal in dBm with the dB lost. From there you change the Status and click Save, resolve open pending items (Done) and open a New task (What needs to be done and Priority), see the latest photos and use Take a photo directly from the camera (the photo storage has a quota), and open Route to here (Google Maps from your position) or View on satellite. Those who only view see the record without the change buttons.

Client sketch

It opens from the Sketch button in the customer properties or from the Client sketch item in the customer menu on the map, in a tab of its own, ready for the work order: the map of the stretch (customer, box and drop, with scale), the Customer data (Name, Code, Status and Coordinate) and the Connection (the box and its status, the splitter port, the drop length, the calculated power and the read power or the last reading, with Online or Offline and the date). Print uses the browser's print, on paper or PDF (landscape works best); the footer records when and by whom the sketch was issued. A customer with no drop to a box opens the sketch with the warning "This client has no drop drawn to a box yet."


Reports and bill of material

The Reports are per project: choose the project in the top bar (the open tab is kept). When there is an area drawn on the map, the reports show only what is inside it; the same goes for a saved region, through the Report for this region button on its card (the notice says the region's name). See the whole project removes the cutout. Spreadsheet downloads the open tab, respecting the filters and the cutout; PDF generates the report for printing (in the Objects tab, the inventory comes out as a spreadsheet). Four tabs:

  • Network analysis: Boxes (FDB/splice closure), POP, Poles, Customers, Cables, Length and Deployment rate; the Network occupancy (Installed ports, Owned, Free and the percentage), for the whole project or the cutout; the status by element type; the cables by fiber count (Qty, Deployed, Planned and Total in meters, with those without a model set apart); drops and ducts; and the customers by status. The lengths follow the path and include the slack.
  • Pole table: the document for sharing with the utility company, with Pole, Utility code, Type, Height (m), Status, Approval, Compliance, Sharing contract, Attachment points, Identified on, Cables, Boxes, Side, Photos, Latitude and Longitude. Filters All, To identify, No contract, Identified, Irregular, Pending, Approved, New and No photo, plus the search by pole, code or box; a warning counts the "pole(s) with attachment points and no identification on record". In Change selected, check the poles and change Status, Approval, Identified on, Attachment points and Tags at once (the tags are added to the existing ones); "Leave as is" keeps the current value. Above 2,000 poles, the screen asks you to split the selection and repeat.
  • Bill of material: Item, Catalog model, Qty (with the unit), Unit price and Total, with the Material total line. Items with no price in the catalog and elements with no model are flagged: register prices and models in Types. It is material, not construction cost: labor, licensing and installation equipment are not included.
  • Objects: the inventory element by element, in the groups Boxes and POPs, Cables and ducts, Customers and Splitters. The boxes show the free ports over the total and the free pass-through ports; the splitters, inputs by outputs.

Types, settings and connected servers

The Types screen holds the technical catalogs: each box, cable, pole and diagram part points to a model from here, which provides the capacity, the colors, the optical losses and the price. The module comes with a factory catalog.

How the screen works

  • Categories: the column on the left (on a phone, a scrollable strip at the top) lists the catalogs Pole, Box, Cable, Splitter, OLT, Optical equipment, GBIC / SFP, Splice, Connector and Pole contract and, last, Customers. The open category is remembered.
  • Search the catalog… filters by name and the other text fields; the chips above the list split the catalog by the main field, with the count; the column header sorts.
  • Add opens the form of the open catalog; Change, on the row, opens the same form filled in. Fields with * are required, and a value outside the accepted range is refused with the field name and the range.
  • factory marks what came ready (it can be edited and deleted, but does not come back on its own); in use shows how many points of the plant use the model, and a model in use cannot be deleted.
  • Color on the row itself: on box, cable and splitter, click the swatch in the list to change the color without opening the form. The No color button, in the form, removes the model color.
  • Permissions: those in the Overview. Add and edit adds and changes models; deleting is only for Manage; View browses without the buttons.

The catalogs and what each one does in the drawing

CatalogFieldsWhat it is for
PoleType (Concrete, Wood, Metal, Fiberglass), Shape (Round, Double T, Square), Height (m), Load (daN).The model of each pole on the map. Height and load appear in the pole report.
BoxBrand, Model, Type (FDB, splice closure or HUB), Slack (m), Splitter that comes inside, Identification color.Every box that uses the model is created with the Splitter that comes inside assembled in the diagram. The Identification color paints on the map the box with no color of its own; without it, the status color applies.
CableBrand, Model, Type (Backbone, Distribution, Drop), Fiber count, Loose tubes, Fibers per tube, Attenuation (dB/km), Color code (ABNT (Brazil) or EIA-598-A (international)), Identification color.Fibers, tubes and color code define the fibers the cable brings to the diagram, each in its color and in its tube (the form shows the Color sequence). The attenuation goes into the power calculation; the color goes to the path.
SplitterMode (Balanced or Unbalanced), Connectorized, Accepts customer, Inputs, Outputs, Attenuation (dB), Tap loss (dB), Unbalanced ratio, Identification color.Accepts customer separates the service splitter (the outputs count as ports in Serviceability and in occupancy) from the tap splitter, counted separately. On the unbalanced one, the Attenuation (dB) is the loss of the through output and the Tap loss (dB) that of the other. Connectorized appears in the diagram with the /AC label and the connection on its ports counts as a connector. The color paints the cone; blank, blue for tap and green for service. The Unbalanced ratio (e.g. 20/80) makes the diagram and the route texts show the real percentage on each output, with the highest on the pass-through; blank, the system derives it from the model name, and factory models come filled in.
OLTSlots, Ports per slot, First PON of each slot, First slot of the chassis, Uplinks, Output power (dBm).The chassis of the POP diagram; the form shows What this chassis adds up to (PON ports, Layout and Uplinks). The Output power (dBm) is the starting point of the calculation to the customer (reference: class B+ about 3 dBm, C+ about 7 dBm), unless a port has its own power in the diagram. First PON and first slot follow the equipment numbering (0 on Huawei and ZTE, 1 on most others).
Optical equipmentBrand, Model, SFP ports, PON ports, SFP output power (dBm), PON output power (dBm).Any active part with SFP and PON ports in the diagram of a POP. With the power filled in, the ports become light sources; blank, the part only documents, and the port can show the reading of a linked sensor.
GBIC / SFPBrand, Model, Form factor (SFP (1G), SFP+ (10G), XFP, QSFP), Mode (Single-mode or Multimode), Transmission (Duplex (2 fibers) or BiDi (1 fiber)), Rate (Gbps), Reach (km), λ TX (nm), λ RX (nm), TX power (dBm), RX sensitivity (dBm).The technical sheet of the optical modules. In duplex, the receive wavelength repeats the transmit one.
Splice and ConnectorAttenuation (dB); on the connector, Polish type (UPC (blue) or APC (green)).The loss of each fusion splice or connector in the power calculation.
Pole contractUtility company, Contract number, Start, End, Price per attachment point.The sharing contract with the utility company, which each pole references; the pole report points out the poles with No contract. With no end date, the contract is in force.

All catalogs have Name and Description (optional); the material ones have Purchase price, per unit (per meter on cable), which goes into the bill of material. When you change the color of a box or cable model, everything that follows the model goes along (boxes with no color of their own and cables in the old color or with no color); when there are items with a different color of their own, the screen counts how many there are and asks: Apply the color brings the model color to them too, Keep as is preserves the choice.

What comes from the factory

Cables (drops of 1, 2 and 4 fibers, ASU and AS from 6 to 144 fibers, Subterrâneo 288FO, the Cabo 1L1F to Cabo 12L144F line and the Drop padrão); balanced splitters from 1x2 to 1x64 and 2x8 to 2x32, unbalanced ones and the AF (fusion, accepts customer), AC (connectorized, accepts customer) and RF (network fusion) lines; boxes (CTOs of 8 and 16 ports, CEOs of 12 and 48 splices, the FDB 01x08, already with the 01x08 AC splitter inside, and the Splice closure padrão, all with no color); OLTs from 1 to 16 slots (OLT 2S8P: 2 slots of 8 PONs); switches and SFP uplinks with no output power; concrete and wood poles; splices; SC and LC connectors in APC and UPC; SFP, SFP+, XFP and QSFP+, including the GPON B+ and C+. Everything can be renamed.

OLT from monitoring: when you place in the diagram an OLT that Ravicor already monitors, the catalog gets its model automatically, with slots, ports per slot, first PON and first slot taken from the collection (which only sees slots and PONs with an authorized ONU; the model remains editable). In the following collections, the model only grows and the name you gave it is kept.

Customers

The last category lists the customers with a coordinate, with the from the map or from management system badges and the columns Name, Code, Box / project, Status and Coordinate. Customers are not registered here: they are created on the map or come through the integration.

FTTH Docs settings

The gear in the bar opens the FTTH Docs settings on any screen, only for the Manage level; they apply to the whole module. A value outside the range is refused with the field name and the accepted range.

  • Serviceability: Search radius (meters), how far to look for boxes from the address (from 10 to 5,000); Maximum boxes listed (from 1 to 50); Link validity (hours), after which the location link sent to the customer stops working (from 1 to 720).
  • Projects and photos: Default coverage radius (meters), the value a new project starts with (from 10 to 5,000); Photo storage (MB), how much space the photos can take, with the current usage next to it (from 64 to 102,400).
  • Live network: Power-failure drops count as Ok (the network is up; what went down was the customer's power outlet) and A power reading deploys the client automatically (if the ONU lit up, the installation happened; checked every hour).
  • Map: Map source only shows what is in effect (Google Maps or the free OpenStreetMap map); the choice is made in Settings > Integrations.

Connected servers

With connected Ravicor servers whose connection allows FTTH Docs, the My Projects screen also lists and manages the projects of each server, as described in Projects.